Over the past decade, data centres have become a much larger part of Ireland’s electricity demand. In 2015 they accounted for 5% of total metered electricity consumption. By 2025 that share had risen to 23%, and this is projected to increase to 31% by 2034. No other country in the world has anywhere near as large a proportion of its electricity used by data centres.

This pace and scale of growth has brought new challenges for Ireland and one of the most pressing is the impact on the electricity grid. How can Ireland manage its electricity grid to deliver on climate action, support new housing, power public transport and other essential infrastructure as well as supply data centres?

What is the electricity grid and how does it work?

Electricity is generated at different locations and transported through power lines and cables before reaching homes and businesses. The electricity grid has physical limits, determined by the size of the cables, transformers and substations, as well as the need to maintain secure and reliable operation.

We need your consent to load this rte-player contentWe use rte-player to manage extra content that can set cookies on your device and collect data about your activity. Please review their details and accept them to load the content.Manage Preferences

From RTÉ Radio 1’s Morning Ireland, RTÉ Economics and Public Affairs Editor David Murphy on how electricity demand is set to grow 45% between now and 2034

This means that connecting a new electricity user is not simply a matter of having enough electricity generation available nationally. The network must also be capable of delivering that electricity to the right location, at the right time. Network capacity is a shared resource and a public good rather than an issue for individual projects alone. We are all connected to the grid and reliant on it.

Scale matters

When considering connecting to the electricity grid, size matters. Data centres are part of a decades-long trend towards increasing digitalisation and represent an industrialised version of what started as computer server racks in businesses. To put the scale in perspective, a modern data centre drawing 50 MW (megawatts of power) continuously would use around nine times as much electricity as St James’s Hospital (one of Ireland’s biggest hospitals) used in total energy, including electricity and fuel, in 2025.

Data centre electricity demand in 2024 would power about 2.3 million electric cars at average Irish mileage. The rapid development of AI now presents further energy-intensive acceleration of data centre growth globally.

We need your consent to load this rte-player contentWe use rte-player to manage extra content that can set cookies on your device and collect data about your activity. Please review their details and accept them to load the content.Manage Preferences

From RTÉ Six One News, CSO reports that data centres accounted for 23% of electricity usage in 2025

Location matters

Power availability is location-specific on the electricity grid. When someone is granted access to the grid, they are provided access to a certain amount of power at that site. The very high demand for connections from data centres over the past decade has seen a large amount of available power allocated to data centres, especially in Dublin. A large, sustained demand at a single connection point presents a different network requirement from the same annual electricity consumption spread across many locations. Data centres are large concentrated demand centres and have shifted demand patterns and power flows around which networks were planned.

The vast majority of data centres are located in the Greater Dublin Area, with particular clusters in North and West Dublin. The concentration of data centres here has absorbed much of the available network capacity. Continued clustering has now left parts of the electricity grid in north and west Dublin effectively “full”. Additional capacity, based on grid upgrades planned or completed, is also effectively already fully accounted for.

Grid upgrades take time and planning, but the scale and pace of demand in these areas is unprecedented in Ireland. As the grid is a shared resource, a full grid is effectively full for everyone. If you’re not in already you will likely face significant delays to getting connected.

From RTÉ Investigates, a look at the role of Big Tech in Ireland and the impact of data centres on communities

The areas of Dublin affected by this hugely increased demand include the locations of important future infrastructure projects in public transport and housing. Where a grid area is effectively full for years to come, even projects needing far less power than a data centre may struggle to connect. While much smaller developments may be able to connect in the meantime, they are all drawing from the same pool of available capacity and options are much more limited.

How did we get here?

The process for connection to the grid is essentially “first come first served”. Anyone seeking an electricity grid connection applies to EirGrid (for large projects) or ESB Networks (for smaller projects) with the details on how much power they need and where. This starts a process where first the available power at that location is identified. If there is not enough power available, then options to upgrade the network to provide the power are determined along with their cost.

Neither ESB Networks nor EirGrid have any clear remit to prioritise one project over another, or to retain capacity for anticipated projects such as possible future housing or public transport infrastructure. In fact, just because capacity was built for a particular purpose doesn’t stop it from being used by another sector. Whoever gets in first with their applications will likely get connected first. Timing of application is a key determining factor. When several large data centres get in first, that can quickly use up any available headroom in that area. Fundamentally, large demand connections, whether data centres or other developments, reduce the capacity available to subsequent applicants in the same area.

We need your consent to load this rte-player contentWe use rte-player to manage extra content that can set cookies on your device and collect data about your activity. Please review their details and accept them to load the content.Manage Preferences

From RTÉ Radio 1’s Today with David McCullagh, are big tech about to build data centres in space?

The electricity grid is a vital part of our everyday life and increasingly so. As IEA executive director Fatih Birol said at COP31, we are now in “the age of electricity”. The grid connects us all: every house, business, school, hospital, and data centre is fundamentally connected by the grid. What one does impacts the other.

The grid is playing and will continue to play a crucial role in meeting our climate goals. This role is wide-ranging with benefits across society. The grid is expected to accommodate offshore/onshore wind and solar PV to provide cleaner electricity. Alongside data centre demand, the grid is expected to take on the electrification of much more of our energy usage that currently relies on fossil fuels: from vehicles, buses and trains, to home heating and industrial heating. Grid development requires investment and careful consideration of all that we need the grid for.

RTÉ Investigates: The People vs Data Centres is broadcast on RTÉ One and RTÉ Player on Monday 30 November at 9:35pm

Follow RTÉ Brainstorm on WhatsApp and Instagram for more stories and updates

Prof. Andrew Keane is Director of the UCD Energy Institute and co-director of NexSys, a Research Ireland Strategic Partnership Programme (21/SPP/3756)


The views expressed here are those of the author and do not represent or reflect the views of RTÉ


Leave a Reply